Recent & Ongoing Projects Summary

Marina Group has successfully delivered a wide range of projects across civil, electrical, and mechanical works, demonstrating strong expertise in both supply and installation. Our portfolio includes high-quality work in block installation, plastering, painting, tiles, marble, granite, interlock, and concrete finishing.

Diriyah Wadi Safar Project Granite Installation (RTCC)

Marina Group successfully delivered the Granite Installation Works for the prestigious Diriyah Wadi Safar Project, ensuring premium quality finishing and long-lasting durability. The scope of work covered:

  • Supply and handling of high-grade granite materials.

  • Precision cutting, shaping, and surface finishing.

  • Installation of granite in designated structures and landscape areas.

  • Polishing, joint treatment, and quality assurance to meet project specifications.

This project demonstrates our strong capability in stone works and luxury finishing, adding value and elegance to high-profile developments.

Diriyah Wadi Safar Project Limestone Embankment Supply & Installation (RTCC)

Marina Group executed the Supply and Installation of Limestone Embankments for the Diriyah Wadi Safar Project, ensuring stability, durability, and aesthetic integration with the surrounding environment. The scope of work included:

  • Procurement and supply of high-quality limestone.

  • Excavation, grading, and preparation of embankment areas.

  • Installation of limestone embankments with proper alignment and compaction.

  • Finishing works to ensure long-term performance and landscape harmony.

This project highlights our expertise in infrastructure and landscaping works, combining engineering precision with environmental considerations.

Diriyah Wadi Safar Swales Diversion Channel Supply & Installation (RTCC)

Marina Group successfully carried out the Supply and Installation of Swales Diversion Channels as part of the Diriyah Wadi Safar Project. The scope of work included:

  • Design coordination and supply of materials.

  • Excavation, trenching, and channel preparation.

  • Installation of swales diversion channels for proper stormwater management.

  • Backfilling, compaction, and finishing works to meet engineering and environmental standards.

This project reflects our capability to deliver specialized infrastructure solutions, ensuring durability, functionality, and sustainability in large-scale developments.

Diriyah Wadi Safar Project Site Prepration Work (RTCC)

Marina Group successfully executed site preparation works for the prestigious Diriyah Wadi Safar Project, which included:

  • Earthworks and leveling.

  • Excavation and backfilling.

  • Road access preparation.

  • Infrastructure groundwork to support upcoming construction phases.

Diriyah Wadi Safar Project Stone Clading Culvert ( RTCC )

Marina Group executed the Stone Cladding Works for Culvert Walls as part of the Diriyah Wadi Safar Project, delivering a durable and aesthetically refined finish. The scope of work included:

  • Supply and selection of high-quality natural stone.

  • Surface preparation and structural treatment of culvert walls.

  • Precision installation of stone cladding with secure fixing methods.

  • Joint finishing, sealing, and polishing to ensure strength and visual appeal.

This project highlights our expertise in stone works, structural finishing, and decorative cladding, ensuring both functionality and architectural elegance in large-scale infrastructure projects.

New Satelite Plant Ph#2 Water Transmission Project Chain Link Fence HCIS Supply & Apply ( RTCC )

Marina Group successfully executed the Supply and Application of Chain Link Fencing (HCIS Standard) for the New Satellite Plant Phase 2 – Water Transmission Project under RTCC. The scope of work included:

  • Supply of HCIS-approved chain link fencing materials.

  • Excavation, foundation, and installation of fence posts.

  • Tension wire, barbed wire, and gate installation as per HCIS specifications.

  • Application of protective coatings to ensure durability and security.

  • Testing and final inspection to meet safety and compliance standards.

This project reflects our capability in delivering high-security fencing solutions, ensuring compliance with HCIS regulations and meeting client requirements for safety and reliability.

New Satellite Plant Phase 2 – Water Transmission Project Block Supply & Apply (RTCC)

Marina Group carried out the Supply and Application of Concrete Block Works for the New Satellite Plant Phase 2 – Water Transmission Project under RTCC. The scope of work included:

  • Supply of high-quality concrete blocks in compliance with project specifications.

  • Masonry works including block laying, alignment, and leveling.

  • Mortar preparation and joint finishing for strength and durability.

  • Surface finishing and curing to ensure long-term performance.

  • Strict adherence to project timelines and safety requirements.

This project showcases our expertise in structural blockwork and masonry services, delivering reliable and durable construction solutions for large-scale infrastructure projects.

New Satellite Plant Phase 2 – Water Transmission Project . Plastering Works – Supply & Apply (RTCC)

Marina Group successfully executed the Supply and Application of Plastering Works for the New Satellite Plant Phase 2 – Water Transmission Project under RTCC. The scope of work included:

  • Supply of high-quality plastering materials in line with project standards.

  • Internal and external wall plastering with proper surface preparation.

  • Application of base and finishing coats to achieve uniform surfaces.

  • Quality control checks to ensure durability, crack resistance, and smooth finishes.

  • Compliance with safety measures and timely delivery of works.

This project highlights our capability in delivering precision finishing works, ensuring both structural protection and superior aesthetics for large-scale infrastructure projects.

Diriyah Wadi Safar Project - Diversion Channel Excavation Work ( RTCC )

Marina Group executed the Excavation Works for Diversion Channels as part of the Diriyah Wadi Safar Project under RTCC. The scope of work included:

  • Bulk excavation and trenching for diversion channel routes.

  • Grading, leveling, and soil stabilization to meet design requirements.

  • Removal, hauling, and proper disposal of excavated materials.

  • Preparation of channels for subsequent lining and structural works.

  • Strict adherence to safety, environmental, and quality standards.

This project demonstrates our strong capability in earthworks and infrastructure preparation, ensuring reliable foundations for water diversion and stormwater management systems.

Diriyah Wadi Safar Project- Slap Concrete Work Supply & Apply (RTCC)

Marina Group successfully executed the Supply and Application of Slab Concrete Works for the Diriyah Wadi Safar Project under RTCC. The scope of work included:

  • Supply of approved ready-mix concrete in compliance with project specifications.

  • Formwork, reinforcement placement, and surface preparation.

  • Concrete pouring, compaction, and leveling for structural slabs.

  • Finishing works including curing to ensure durability and strength.

  • Strict compliance with safety, quality, and timeline requirements.

This project reflects our expertise in structural concrete works, ensuring high-quality, long-lasting construction that meets engineering and client standards.

New Satellite Plant Phase 2 – Water Transmission Project - Marbles , Tiles Supply & Apply ( RTCC )

As part of the New Satellite Plant Phase 2 Water Transmission Project, our scope includes the supply and application of marbles and tiles in accordance with project specifications and RTCC standards.

The work covers:

  • Procurement and delivery of high-quality marble and tile materials.

  • Surface preparation to ensure proper leveling and finishing.

  • Installation of floor and wall tiles in designated project areas.

  • Laying, cutting, fixing, and joint grouting for durable finishing.

  • Compliance with quality control, safety standards, and project schedule.

This package ensures long-lasting, aesthetically appealing, and technically sound finishes that meet both functional and architectural requirements of the project.

New Satellite Plant Phase 2 – Water Transmission Project- Painting Work Supply & Apply

New Satellite Plant Phase 2 – Water Transmission Project – Painting Work Supply & Apply (RTCC)

Within the New Satellite Plant Phase 2 Water Transmission Project, our scope covers the supply and application of painting works in line with RTCC standards and project specifications.

The scope includes:

  • Supply of approved paints, primers, and related materials.

  • Surface preparation (cleaning, sanding, priming, putty application).

  • Application of interior and exterior paints for walls, ceilings, and other designated surfaces.

  • Specialized protective coatings where required for durability and environmental protection.

  • Ensuring smooth, uniform finishing with strict adherence to safety and quality standards.

This package ensures aesthetic, durable, and protective finishes that enhance the project’s overall quality and longevity.

Al Nargis Project- GYPSUM Board Supply & Apply

As part of the Al Nargis Project, our scope includes the supply and application of gypsum board works in accordance with project requirements and quality standards.

The scope covers:

  • Supply of high-quality gypsum boards, framing systems, and accessories.

  • Installation of partitions, ceilings, and wall linings as per drawings and specifications.

  • Joint treatment, finishing, and surface preparation for painting or other finishes.

  • Execution of works with proper alignment, leveling, and durability.

  • Compliance with safety regulations and project schedules.

This package ensures modern, durable, and aesthetic finishes, contributing to the overall quality and functionality of the Al Nargis Project.

khobar Project- GYPSUM Board Supply & Apply

In the Khobar Project, our scope of work includes the supply and application of gypsum board systems in line with the approved specifications and quality standards.

The scope involves:

  • Procurement and delivery of gypsum boards, framing materials, and required accessories.

  • Installation of gypsum board partitions, ceilings, bulkheads, and wall linings.

  • Joint treatment, taping, finishing, and surface preparation for subsequent painting or finishing works.

  • Ensuring precise alignment, durability, and fire/sound resistance where required.

  • Adherence to project timelines, safety procedures, and quality control measures.

This package ensures high-quality, durable, and aesthetically pleasing finishes, enhancing the architectural and functional aspects of the Khobar Project.

Diriyah Pkg#3 Project - Fencing Supply & Apply (Etqaan & Metallic Equipment )

As part of the Diriyah Pkg#3 Project, our scope covers the supply and application of fencing works in collaboration with Etqaan and Metallic Equipment, in full compliance with project specifications and standards.

The scope includes:

  • Supply of chain link fences, gates, posts, and all required metallic accessories.

  • Site preparation, alignment, excavation, and concrete foundations for fence posts.

  • Installation of fencing systems with proper tensioning and stability.

  • Coordination with Etqaan & Metallic Equipment for quality materials and specialized items.

  • Compliance with HCIS/security standards, safety measures, and project timelines.

This package ensures durable, secure, and high-standard fencing systems that meet both functional and safety requirements of the Diriyah Pkg#3 Project.

EVIQ-ASFAN PROJECT (Civil Work ) with Aitilaf Alshoula for Contracting Co.

EVIQ – Asfan Project – Civil Work Scope
With Aitilaf Alshoula for Contracting Co.

In the EVIQ – Asfan Project, our company’s scope is focused exclusively on civil works, executed in partnership with Aitilaf Alshoula for Contracting Co. in accordance with project requirements and specifications.

The civil works scope includes:

  • Site preparation, clearance, and leveling.

  • Excavation, backfilling, and compaction works.

  • Concrete works for foundations, pedestals, and structural supports.

  • Masonry, plastering, and block works as required.

  • Finishing of civil-related areas to ensure readiness for subsequent trades.

  • Strict compliance with safety, quality control, and project schedules.

This package ensures strong structural foundations, durable finishes, and precise execution to meet the technical and functional demands of the EVIQ – Asfan Project.